Skip to content

Refresh RPM lockfiles - #23202

Open
red-hat-konflux[bot] wants to merge 1 commit into
release-5.0from
konflux/mintmaker/release-5.0/lock-file-maintenance
Open

red-hat-konflux[bot] wants to merge 1 commit into
release-5.0from
konflux/mintmaker/release-5.0/lock-file-maintenance

Conversation

@red-hat-konflux

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

File rpms.in.yaml:

Package Change
kernel-headers 5.14.0-687.53.1.el9_8 -> 5.14.0-687.54.1.el9_8

🔧 This Pull Request updates lock files to use the latest dependency versions.


Configuration

📅 Schedule: (in timezone Etc/UTC)

  • Branch creation
    • Between 12:00 AM and 04:59 AM (* 0-4 * * *)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

♻ Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

To execute skipped test pipelines write comment /ok-to-test.


Documentation

Find out how to configure dependency updates in MintMaker documentation or see all available configuration options in Renovate documentation.

Signed-off-by: red-hat-konflux <126015336+red-hat-konflux[bot]@users.noreply.github.com>
@red-hat-konflux red-hat-konflux Bot added the mintmaker-auto-merge Automatically approve and merge PRs from MintMaker via the corresponding workflow. label Oct 2, 2026
@red-hat-konflux
red-hat-konflux Bot requested review from a team and rhacs-bot as code owners October 2, 2026 05:00
@github-actions github-actions Bot added backport PR to backport changes from master to release branch konflux-build Run Konflux in PR. Push commit to trigger it. labels Oct 2, 2026
@github-actions

github-actions Bot commented Oct 2, 2026

Copy link
Copy Markdown
Contributor

🚀 Build Images Ready

Images are ready for commit 9b6276d. To use with deploy scripts:

export MAIN_IMAGE_TAG=5.0.0-rc.2-1-g9b6276d9f2

@codecov

codecov Bot commented Oct 2, 2026

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.
✅ Project coverage is 51.89%. Comparing base (c5682f9) to head (9b6276d).

Additional details and impacted files
@@               Coverage Diff               @@
##           release-5.0   #23202      +/-   ##
===============================================
- Coverage        51.93%   51.89%   -0.05%     
===============================================
  Files             2901     2901              
  Lines           182875   182875              
===============================================
- Hits             94973    94895      -78     
- Misses           79601    79656      +55     
- Partials          8301     8324      +23     
Flag Coverage Δ
go-unit-tests 51.89% <ø> (-0.05%) ⬇️

Flags with carried forward coverage won't be shown. Click here to find out more.

☔ View full report in Codecov by Harness.
📢 Have feedback on the report? Share it here.

🚀 New features to boost your workflow:
  • 📦 JS Bundle Analysis: Save yourself from yourself by tracking and limiting bundle sizes in JS merges.

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport PR to backport changes from master to release branch konflux-build Run Konflux in PR. Push commit to trigger it. mintmaker-auto-merge Automatically approve and merge PRs from MintMaker via the corresponding workflow.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants