Skip to content

Release Studio 0.1.0-alpha.11 - #7

Merged
mikebarkmin merged 3 commits into
mainfrom
release/alpha.11
Oct 9, 2026
Merged

mikebarkmin merged 3 commits into
mainfrom
release/alpha.11

Conversation

@mikebarkmin

@mikebarkmin mikebarkmin commented Oct 9, 2026 •

Copy link
Copy Markdown
Member

Bumps the version to 0.1.0-alpha.11 with two fixes:

  • The stage code and stage designer open again after switching projects or returning from the start page. Closing a project cleared the tab pane but not the editor's maps of open code and tool tabs, so a file that was open before selected a tab that no longer showed.
  • A program is no longer called stuck while its loading screen sits at 100% on a slow PC. The heartbeat now says when the library still shows its loading screen, and the watchdog waits 20 seconds there instead of 3; a frozen running program is still reported after 3 seconds (IdeControlIT checks the flag is off once the stage runs).

scripts/test.sh (unit, smoke, integration) passed locally; IdeControlIT passes under Xvfb. After merging, the v0.1.0-alpha.11 tag starts the release build.

Closing or switching a project cleared the tab pane but not the maps of
open code and tool tabs, so opening a file that was open before selected
a tab that no longer showed and nothing appeared.
The heartbeat says when the library still shows its loading screen, and
the watchdog then waits 20 seconds instead of 3: slow school PCs draw
nothing for a few seconds at 100% while the stage takes over.
@mikebarkmin
mikebarkmin merged commit a00f16f into main Oct 9, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant