Analysis and Design of a Grid-Connected Real Plant Using ETAP

Software Study Domain

Software / Language: ETAP 19.0.1C (no programming language used) Study case: Load Flow (LF) Type: Academic group project, B.E. Electrical Engineering (Power), Air University, Islamabad

Overview

A grid-connected plant modelled in ETAP: a 220 kV grid source feeds a 30 kV network through two 63 MVA transformers, which is stepped down to 11 kV, 6 kV, 1 kV and 0.63 kV levels for motors, capacitor bank, charger/inverter loads and general loads. The report contains the single-line diagrams, equipment input data and the load flow, loading, loss and alert reports.

System summary

Item Data
Grid source 220 kV, 5029.875 MVAsc
Transformers 1 and 2 63 MVA, 220/30 kV
Transformers 3 and 4 20 MVA, 30/11 kV
Transformers 6 to 10 3.5 MVA, 11/1 kV
Transformer 5 2 MVA, 11/1 kV (feeds 1.6 MVA load and 1000 kvar capacitor bank)
Transformer 11 6 MVA, 11/6 kV (feeds six 500 kW/HP induction motors)
Charger/inverter branches Five branches, 0.63 kV, 3150 kVA load each
Cables Cable2 to Cable5 (32808.4 ft each)
Total generation (swing bus) 10.222 MW, 3.240 Mvar
Total branch losses 1095.5 kW, 2274.3 kvar

Report content

1. Design of schematics (single-line diagrams)

Part (a): 220 kV grid and the two 63 MVA power transformers. Part (b): 30 kV network with cables and the 20 MVA transformers.

Schematics a and b

Part (c): 11 kV bus, 11/1 kV transformers, chargers and inverters, capacitor bank and the motor feeder.

Schematic c

2. Use of induction motors

Induction motor equivalent circuit parameters and the torque, current and power factor curves against slip.

Induction motors

3. Load flow analysis

Bus voltages, generation, loads and branch power flows from the ETAP load flow report.

Load flow report

4. Two-winding transformer input data and 5. Branch losses summary

Transformer data and branch losses

6. Bus loading summary, 7. Branch connections, 8. Adjustments

Bus loading, branch connections, adjustments

9. Bus input data

Bus input data

10. Line/cable/busway input data and 11. Alert summary

Cable data and alert summary

12. Critical report and 13. Branch loading summary

Critical and branch loading reports

Full report

The complete report is available as a PDF: ETAP_Grid_Connected_Plant_Analysis.pdf

My role

Modelled the complete grid-connected plant in ETAP — built the single-line diagrams across all three voltage sections (220 kV/30 kV/11 kV), configured transformer, cable, motor, and load parameters, ran the load flow study, and compiled the equipment input data, loading, loss, and alert reports into the final analysis.

Team

Muhammad Shahzaib, Muhammad Ali, Muhammad Hamza Nasir (Islamabad Electric Supply Company)