PCMC Bhavan metro station
Appearance
PCMC Bhavan | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| General information | |||||||||||
| Location | Morewadi, Pimpri Colony, Pimpri Chinchwad, Maharashtra 411018 | ||||||||||
| Coordinates | 18°37′46″N 73°48′12″E / 18.6294°N 73.8033°E | ||||||||||
| System | Pune Metro station | ||||||||||
| Owner | Maharashtra Metro Rail Corporation Limited (Maha Metro) | ||||||||||
| Operator | Pune Metro | ||||||||||
| Line | Purple Line | ||||||||||
| Platforms | 2 Side platform | ||||||||||
| Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Station code | PIM | ||||||||||
| History | |||||||||||
| Opened | 6 March 2022 | ||||||||||
| Passengers | |||||||||||
| Sept 2024 | |||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
PCMC Bhavan is an elevated metro station serving as the northern terminal of Purple Line of Pune Metro in Pimpri Chinchwad, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro.[citation needed] From March 2022 to July 2023, the Purple Line operated between PCMC Bhavan and Phugewadi,[2] but from 1 August 2023 the section between Phugewadi and District Court Pune metro station came into use, so trains ran from PCMC Bhavan to Civil Court.[3] On 29 September 2024, the launch of Pune Metro Phase I was completed and the Purple Line was fully operational from PCMC to Swargate.[4] An extension has been planned which will move PCMC station's terminal status and extend the line to Nigdi.[5]
Station layout
[edit]PCMC Bhavan track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 1 Southbound |
Towards → Swargate Next Station: Sant Tukaram Nagar | |
| Platform 2 Northbound |
Towards ← Train Terminates Here | |
| Side platform | Doors will open on the left | ||
| L2 | ||
Gallery
[edit]- Nameboard of PCMC Bhavan metro station.jpg.
- Facade of PCMC Bhavan metro station
See also
[edit]References
[edit]- ↑ "Significant Increase in Pune Metro's Daily Ridership in September 2024" (PDF). Maharashtra Metro Rail Corporation Limited. 3 October 2024. Retrieved 22 December 2024.
- ↑ Pandya, Naomi (6 March 2022). "Passenger operations on 12 km routes of Pune Metro launched know all about". Urban Transport News. Retrieved 8 March 2022.
- ↑ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times.
- ↑ "PM to inaugurate Pune Metro section of District Court to Swargate". pib.gov.in. 28 September 2024. Retrieved 29 September 2024.
- ↑ "Maha-Metro awaits Centre's nod to extend two Pune routes". Hindustan Times. 19 January 2023. Retrieved 3 August 2023.
