I have found trying to do this without a walkthrough has been insanely tough, mainly because you need output from central before installing the other chart. If someone has installed this via Declarative Ops (where you can configure the values file ahead of time) then can you please post a walkthrough for it.
I believe this won't just help me but will help with team adoption in a secure manner. Thanks ahead of time and hope this gets scoped in.
I have found trying to do this without a walkthrough has been insanely tough, mainly because you need output from central before installing the other chart. If someone has installed this via Declarative Ops (where you can configure the values file ahead of time) then can you please post a walkthrough for it.
I believe this won't just help me but will help with team adoption in a secure manner. Thanks ahead of time and hope this gets scoped in.