Skip to content

Latest commit

 

History

History
72 lines (55 loc) · 3.04 KB

File metadata and controls

72 lines (55 loc) · 3.04 KB

Relates to

Change

Testing

  • Targets develop and has no conflicts with the latest origin/develop.
  • Ran bun install and bun run verify after syncing; record blockers below.
  • Updated relevant documentation.

Evidence Gate

Evidence must match the reviewed commit. packages/scripts/pr-evidence.ts rows sets the marker from the live PR head; rerun after each push.

Keep every row. Attach artifacts inline or write N/A - <reason> where inapplicable. UI changes require desktop/mobile before-and-after screenshots, a walkthrough, logs, and OCR review. Use MP4 videos and preferably JPG images. Keep generated artifacts out of source control.

  • Before full-page screenshots are attached for every affected UI surface (desktop and mobile), or marked N/A - <reason>.
  • After full-page screenshots are attached for every affected UI surface (desktop and mobile), or marked N/A - <reason>.
  • A video walkthrough of the complete user flow is attached, or marked N/A - <reason>.
  • Backend logs show the real code path firing end to end, or are marked N/A - <reason>.
  • Frontend console and network logs show the request/response and state change, or are marked N/A - <reason>.
  • Real-LLM trajectory is attached for agent/action/provider/prompt/model changes, or marked N/A - <reason>.
  • Domain artifacts are attached where applicable (DB rows, memories, scheduled tasks, wallet/on-chain output, generated files, audio, etc.), or marked N/A - <reason>.
  • OCR visual-text review output is attached for UI changes, or marked N/A - <reason> when the change has no rendered visual surface.

Evidence Details

For app UI changes, run bun run --cwd packages/app audit:app and inspect the captures. bun run test:matrix:review produces and reviews a verified bundle; use the bundle path printed by the command to revisit that same run.

Known gaps / failures

Deployment