Skip to content

Phase 10 Addendum AD01 / Task AD5: Prepare and Verify clean-pr Locally #205

Closed

Description

@Sam-Bolling

Planning authority:


  • Objective: Construct the AD01 delivery as one local normal merge, prove it matches the accepted workbench, and hand a fully verified unpushed commit to existing issue Phase 10 / Task F3: Push Delivery, Refresh PR #136, and Verify Checks #200.
  • Acceptance criteria advanced: P10-AD01-A1, P10-AD01-A2, P10-AD01-A3, P10-AD01-B5, P10-AD01-C2, P10-AD01-C4.
  • Dependencies: AD4.
  • Complexity/risk: High; reversible local mutation of the delivery repository.
  • Locked decisions: Same upstream SHA; normal merge; exact accepted workbench blobs for three conflicts and src/ogc-api/model.ts; no force-push; no remote delivery or PR mutation in this task.
  • Expected work:
    • record clean delivery branch, remote head, remotes, ancestry, and PR base/head metadata;
    • fetch origin, upstream, and the exact accepted workbench tip into a namespaced local ref;
    • merge exactly a623911201218bc1e814a9f83c64f3a027031990 into local clean-pr;
    • confirm the conflict set matches AD1/AD2;
    • restore the three accepted workbench conflict-resolution blobs and the accepted src/ogc-api/model.ts blob, then inspect automatic src/index.ts;
    • commit the local normal merge without pushing;
    • generate the contribution-bearing delivery manifest and compare every included path with the accepted workbench;
    • audit for zero workbench-only planning, research, governance, issue, workflow-trigger, ignore-rule, temporary, or generated artifacts;
    • repeat full applicable QA, docs, build, packed-artifact, and clean-consumer checks in delivery;
    • record the local commit/tree SHAs, expected ahead count, and exact handoff requirements for Phase 10 / Task F3: Push Delivery, Refresh PR #136, and Verify Checks #200; and
    • commit and push the durable delivery-preparation/handoff evidence to workbench phase-10 without pushing delivery.
  • Affected areas: Local OS4CSAPI/ogc-client:clean-pr, limited to the normal upstream merge and reviewed resolution/adaptation content; one workbench handoff-evidence record under docs/research/phase-10/.
  • Explicit exclusions: Push, force-push, PR body/comment change, new source work, independent re-authoring of resolutions, workbench-only file delivery.
  • Automated acceptance gate:
    • delivery contains the locked upstream SHA and exactly the reviewed merge resolution population;
    • contribution-manifest comparison with accepted workbench reports zero differences;
    • prohibited-path audit reports zero delivery contamination;
    • full delivery QA, documentation, build, package, and consumer gates exit 0;
    • delivery worktree is clean and local clean-pr is ahead of origin/clean-pr only by the reviewed normal merge;
    • no remote delivery ref or PR metadata changed; and
    • the committed and pushed workbench handoff record points explicitly to existing issue Phase 10 / Task F3: Push Delivery, Refresh PR #136, and Verify Checks #200.
  • Deliverable: A fully verified local clean-pr merge ready for one normal push by issue Phase 10 / Task F3: Push Delivery, Refresh PR #136, and Verify Checks #200, plus committed and pushed workbench handoff evidence.
  • Closing evidence: Local commit/tree SHAs, accepted workbench SHA, manifest/parity results, prohibited-path audit, all delivery gates, remote non-mutation proof, Phase 10 / Task F3: Push Delivery, Refresh PR #136, and Verify Checks #200 handoff, deviations or none.

Activity

  1. Sam-Bolling commented on Aug 28, 2026

    @Sam-Bolling
    Author

    I have reviewed the AI Operational Constraints.
    Issue goal: Construct the AD01 delivery as one local normal merge, prove it matches the accepted workbench, and hand a fully verified unpushed commit to existing issue #200.
    Assumptions requiring confirmation: none.

  2. Sam-Bolling commented on Aug 28, 2026

    @Sam-Bolling
    Author

    AD01 Task AD5 is complete.

    Workbench evidence commit: 4ca1d7d
    Delivery handoff report: 09-task-ad5-delivery-handoff.md

    • Prepared local clean-pr: b55d95aa0bd9f0cacf1e8b37953fde1ba14523f9; tree 87fc78c9524aac32c668969ce32f96c84c8b03d9.
    • Merge parents: prior delivered head 5f7cbd166143be76b60ea54593d6f313c75c3624 and locked upstream a623911201218bc1e814a9f83c64f3a027031990.
    • Conflict population: exactly the three reviewed files. Five coexistence blobs match the accepted workbench exactly.
    • Generated AD01 manifest: 32 paths, exact AD1 match; workbench parity differences 0; prohibited introduced paths 0.
    • Complete delivery/workbench differences: 538, all classified as excluded workbench records/configuration; unexpected differences 0.
    • Local Node 24 checks passed: clean install, formatting diagnostic, typecheck, lint, 30/30 CSAPI suites (1,383 tests), docs build, production build, package inventory, and git diff --check.
    • Packed artifact: 521 files with all root and /csapi JavaScript/declaration targets. Offline runtime and strict NodeNext declaration consumer checks passed with zero live calls.
    • All generated/package/consumer artifacts were removed; delivery worktree is clean.
    • Remote origin/clean-pr and PR D-1: Resolve SystemTypeUris name collision between model.ts and constants.ts #136 remain unchanged at 5f7cbd166143be76b60ea54593d6f313c75c3624. No delivery push, force-push, or PR mutation occurred.
    • Workbench handoff QA run 33183183614 passed.

    Deviation from locked decision: none. Existing issue #200 is now dependency-ready and owns the normal delivery push and PR/check refresh.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions