Skip to content

Latest commit

 

History

History

CD-CI

Folders and files

NameName
Last commit message
Last commit date

parent directory

..
 
 
 
 

Continuous delivery

Lead time and clock time. (idea to production) (lead time - estimation planning) - of interest in CI.

cycle time : Measure of engineering efficiency.

Continuous delivery

Continuous Integration - (worst part of project everyday?)

  • doing things as eagerly as possible rather thana doing it in end. integerating

    • Integrate a early as possible
  • Check in trunk daily atleast once.

Continuous Deployment (final stage)

Deployment Pipeline - Fast automated feedback on the Production readiness for :

  • your application every time there is a change.
  • To Code, infrastructure, or configuration.

Pre-requisite

  • comprehensive configuration management.
  • excellent automated testing at all levels.

Stages in deployment pipeline :

Commit stage :

  1. version control - source code commit, test build scripts.
  2. Commit Stage : Compile + unit test + assemble + code analysis deployable binaries, test reports, metadata
  3. Artifactory repository